Maintenance worksUnit 4 shut down at Cattenom nuclear power plant

RTL Today
Maintenance works are being carried out on a turbopump in the non-nuclear zone.
© AFP

At 8am on Sunday morning, Unit 4 at Cattenom was shut down for maintenance works to be carried out in the power plant's non-nuclear zone.

As it stands, only Unit 1 is active, with both Units 2 and 3 shut down for other maintenance since the 3 and 26 April respectively.

Back to Top
CIM LOGO