
The construction site will affect the slip road near the Pontpierre interchange in the direction of Raemerich. The entire operation will last from 9 May until 9 August, during which the slip road will not be accessible for regular traffic.
A diversion will be set up to redirect traffic to the Schifflange interchange via the N13 and the CR169.