
This advanced plant has the capacity to treat 111,000 cubic metres of water per day, a significant increase compared to the previous site in Esch-sur-Sûre. The first production line was already put into operation in 2022.
The Upper Sûre Lake, the largest drinking water reservoir in the country, serves as a vital water source for 90% of Luxembourg’s population.
The construction of the new drinking water facility cost over €200 million.