From 22 May to 28 JulyN12 between Dondelange and Bour shut for two months

RTL Today
The N12 between Dondelange and Bour will be closed as of Monday due to bridge construction work which will be carried out in the area. The road is scheduled to reopen on 28 July.

A 200-metre-long section of the N12 will be completely shut to traffic. A detour will be set up via the CR102 and the CR105, respectively. From Saeul, a sign with the words “sens recommendé” (“recommended direction”) will further advise motorists to take the N8 to get to the A7 motorway via Mersch.

Back to Top
CIM LOGO