Hauling heavy goodsRemarkable transport of new footbridge along narrow alleys of Grund

RTL Today
The transportation of the footbridge featured an impressive feat of engineering as it had to be disassembled to pass through the bridge at Rue Münster.

On Sunday morning, a new footbridge had to be disassembled into four components, each measuring 15 meters long and 2 meters wide, in order to be transported through the narrow alleys of the Grund, Luxembourg City, particularly through the bridge on Rue Münster.

Once it had arrived at its destination at the Biisserplaz, it was unloaded before being welded together and painted.

Watch the report in Luxembourgish

Schwéiertransport am Gronn
Impressionnant Biller vun engem Schwéiertransport am Gronn.

Back to Top
CIM LOGO