
The motorway will be closed on the following dates, from 5 November until 17 December:
From 6pm from Sunday 5 November until 8pm on Tuesday 7 November, the tunnel will be closed in the direction from Germany towards Pétange, although traffic will run both ways in the other direction.
From 8pm on Tuesday 7 November until 6pm on Saturday 11 November: the tunnel from Pétange towards Germany will be closed, with two-way traffic directed through the other tunnel.
On Sunday 26 November, both tunnels will be closed in both directions from 8am until 4pm. Traffic will be deviated via signage.
From 10am on Tuesday 28 November until 8pm on Wednesday 6 December, the tunnel will be closed in the direction from Germany towards Pétange. Traffic in both directions will be directed through the second tunnel.
From 8pm on Wednesday 6 November until 6pm on Friday 15 December, the tunnel from Pétange towards Germany will be closed, with two-way traffic directed through the other tunnel.
Both tunnels will be closed once again from 8am on Saturday 16 December until 4pm on Sunday 17 December, with traffic deviations in place.