EttelbruckNew Patton bridge to open two lanes from 29 March

RTL Today
Two lanes will open to traffic on the new Patton bridge in Ettelbruck, starting 9am on Monday morning. The third lane will remain closed for further roadworks.
© RTL (Archiv)

The roadworks are expected to end this summer.

Starting Monday, traffic users will be able to use two traffic lanes (one in the direction of Diekirch, the other in the direction of Ettelbruck), while the third is still being used for the deconstruction work of the old bridge structure.

As of Friday, traffic will be able to travel in the direction of Diekirch.

Back to Top
CIM LOGO