
The roadworks are expected to end this summer.
Starting Monday, traffic users will be able to use two traffic lanes (one in the direction of Diekirch, the other in the direction of Ettelbruck), while the third is still being used for the deconstruction work of the old bridge structure.
As of Friday, traffic will be able to travel in the direction of Diekirch.